
We will carry on the tradition of our company and incorporate
the Metal Finishing Division into our Quality Management
System AS9100 / ISO 9001 facility as well as NADCAP
and customer approvals in all of our special processes.
Our
Chemical Finishing Department is equipped with 3' x
4' x 12' tanks that are highlighted by two PLC controlled
hoists that communicate to a centralized computer for
traceability and batch time runs. This centralized computer
as well receives feedback from other monitoring devices
to record tank temperatures and concentrations
|
|
"We will embrace
an attitude of Customer Service Superiority and consistently take
the actions necessary to always be our customer's first choice
of service and supply"
FWM and MFD NEWS &
INFORMATION:
Fort Walton Machining, Inc implements E2 Shoptech MRP System -
October 2003:
Streamlined
process from Quoting to Shipping
Fort Walton Machining, Inc kicks off 6S Program
2007 - Kickoff
6S Program Roll-Out - Jan 08 thru Aug 08
FWM receives Boeing Performance Excellence Award - 2007
FWM receives Boeing Performance Excellence Award - 2008
New HAAS gantry's added - September / October 2008
HAAS GR510
HAAS GR512
New addition in March 2009:
20,000 sq/ft
Equal to original size of main manufacturing
12 Additional Offices w/ large 165 person capacity conference
room
Total area = 65,000 sq/ft
New Division Launched in 2010:
Fort Walton Machining is proud to open the all new
Metal Finishing Division
New web site in October 2010:
New look of the FWM web site
New pages showcasing our equipment
Meet our Board of Directors
|
MFD:

The new Metal Finishing (MFD) facility is like none other
in the Southeast! The MFD features a 400 foot conveyer
driving the paint line, a 40 foot gas oven for curing,
three paint booths, and a climate controlled paint booth
coming online soon to satisfy the specifications for
fuel tank coatings.
 |
|